top of page

Delivery Information

Typical lead time for most of our hydrogen on demand  products is one to three weeks (please see charts below). We always strive to get our products out as fast as possible with the care and precision that our customers have come to expect from us.

 

If you need a hydrogen on demand  component (membrane electrode assembly, gas diffusion electrode, nafion membrane, gas diffusion layer) shipped out even sooner, please contact us and let us know and we can discuss with you what we can do to speed up the delivery process.

danieldonatelli@hotmail.com  it is far better to plane with us and get things clear about delivery times and specs.

 

Fuel Cell Components

Typical Lead Time*

 

5-Layer Membrane Electrode Assembly (MEA)

1 to 2 days

3-Layer Membrane Electrode Assembly (MEA)

2 to 3 days

Custom Membrane Electrode Assembly (MEA)

2 to 4 days

Gas Diffusion Electrode (GDE)

1 to 2 days

Custom Gas Diffusion Electrode (GDE)

2 to 3 days

Gas Diffusion Layer

1 day

Nafion Membrane

1 day

Catalyst

1 day

 

 

*Hand Built Custom Jobs allow 10-15 Days Status reports

and pics happen along the way.

 

Lead time is dependent on materials being stock.

When materials are out of stock the lead time will increase.

 

Fuel Cells and Accessories

 

Typical Lead Time

Hydrogen Air Fuel Cells

4 to 6 weeks

Cell Voltage Monitor (CVM)

1 to 3 weeks

Hydrogen Storage - Metal Hydride                   

1 to 3 weeks

 

Warmest regards

 

Daniel

bottom of page