Delivery Information
Typical lead time for most of our hydrogen on demand products is one to three weeks (please see charts below). We always strive to get our products out as fast as possible with the care and precision that our customers have come to expect from us.
If you need a hydrogen on demand component (membrane electrode assembly, gas diffusion electrode, nafion membrane, gas diffusion layer) shipped out even sooner, please contact us and let us know and we can discuss with you what we can do to speed up the delivery process.
danieldonatelli@hotmail.com it is far better to plane with us and get things clear about delivery times and specs.
Fuel Cell Components |
Typical Lead Time*
|
5-Layer Membrane Electrode Assembly (MEA) |
1 to 2 days |
3-Layer Membrane Electrode Assembly (MEA) |
2 to 3 days |
Custom Membrane Electrode Assembly (MEA) |
2 to 4 days |
Gas Diffusion Electrode (GDE) |
1 to 2 days |
Custom Gas Diffusion Electrode (GDE) |
2 to 3 days |
Gas Diffusion Layer |
1 day |
Nafion Membrane |
1 day |
Catalyst |
1 day
|
*Hand Built Custom Jobs allow 10-15 Days Status reports
and pics happen along the way.
Lead time is dependent on materials being stock.
When materials are out of stock the lead time will increase.
Fuel Cells and Accessories |
Typical Lead Time |
Hydrogen Air Fuel Cells |
4 to 6 weeks |
Cell Voltage Monitor (CVM) |
1 to 3 weeks |
Hydrogen Storage - Metal Hydride |
1 to 3 weeks |
Warmest regards
Daniel