top of page

S1 Step 1 Variations

The Secure Supplies Step 1 Design can have several input configurations

This could be Energy Storage Power to Gas or Gas refinements to vale add gases . 

We mention some here . 

  • PEM Electrolyzer Power to H2

  • Alkaline Electrolyzer Power to H2

  • Bio Gas Natural Gas to H2

  • Methanol to H2

  • Methane to H2

  • Voltrolysis Power to H2 

  • Bio Char to H2

  • Other Gases can be done in S1  O2 N2 H2 CO2 NH3 and H2+N2 Mix

Various S1 Step Secure Supplies.jpg

Power Sources

  • Grid Power

  • Nuclear Power

  • Geothermal Power 

  • Hydroelectric Power

  • Solar Power 

  • Solid State Power 

  • Diesel Fueled Power 

  • Natural Gas Power 

  • Bio Gas Fueled Power 

  • Ambient Thermal Power 

  • CHP Power 

  • Thermoelectric (Peltier) Module Chip Power 

  • Chemical Reaction Power 

  • Electron Extraction Power 

Solar,Gas,Energy,Storage,Solar,Wind,Geothermal,Hydrogen,
Hydrogen Fuel Energy Storage Plant 

Secure Supplies  is ready to get Started on your Power Plant Project Are you ?

PLEASE Contact us now to 

GET THE PROCESS STARTED

 

We will Touch base on phone

and email shortly to Discuss a POWER PLANT PROPOSAL  .

bottom of page